The World’s first 3-d printed office building has opened in Dubai, UAE. It was printed in China and constructed in 17 days, saving 80% on construction costs.
rocket
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114The World’s first 3-d printed office building has opened in Dubai, UAE. It was printed in China and constructed in 17 days, saving 80% on construction costs.